Western Black Sea
Zonguldak silo haulage and licensed waste transport
The Western Black Sea is the origin bank of the cycle: fly ash from thermal plants and slag from steelworks travel from here to cement plants and concrete producers. It is one of our priority regions for fly ash sales and transport.
- Region
- Western Black Sea
- Distance
- 330 km
- Drive time
- 5–6 h
- Corridor
- TEM (O-4) → Düzce → D-655 Karadeniz Ereğli / Zonguldak
The corridor follows the TEM to Düzce and descends to the coast on the D-655; loading is by top hatch or pneumatic line depending on the facility.
Industry profile
- Thermal power plants and coalfield facilities: fly ash source
- Iron and steel works: blast furnace slag source
- Port and shipyard districts
Materials carried on this route
- Thermal power plantConcrete plantSilo trailer
- Blast furnaceCement plantSilo trailer
- Industrial plantRecovery and disposalSilo, pool, flatbed, tipper
Vehicle types
- Silo trailer
- Tractor + silo semi-trailer
- Licensed silo trailer
- Pool tipper
- Flatbed
- Tipper truck
- Tractor unit
Request a quote for Zonguldak.
Tell us the material, quantity, loading and unloading points; we will set the right vehicle and plan for the corridor.